December 19, 2004
Run Day




Lots of activity at the depot.


Bill engineers his UP train through the depot area.


Dale at the controls of a Majestic loco.


Steam and diesel at the steaming bays.


A sleeper car...


Harry engineers the PCRy No. 2 with a full passenger load.


A PCRy lumber flat out on the mainline.


A couple work flats with ties for the new steel rail.


Laying the new steel rail has now made it all the way around from the car barn to the yard area proper.


Installation of the steel rail is also bringing the rail level up several inches to eliminate the "yard dip".


Forms are being put in place to pour the foundation of a carbarn at the turntable up in the Mountain Division.


No. 4409 awaits at the steaming bay.


This mixed consist moves on down the mainline.


BNSF No. 2001 crosses a bridge.

Previous Work Day... | More...


| What's New | HO Layout | Schedule of Events | Home | Stories | Memorials | Links | About | Facebook |

This site was last updated on March 17, 2024 - What's New
Copyright © 2003-Present. Over 20 years!
All rights are reserved as to text and images on this web site either by the BCWRR or the writer/creator of the material.
The rolling stock images used/modified at the top for navigation are from Dan's Depot.