July 16, 2005
Work Day




Tearing out the old track.


The new steel track was built right on top of the old track which makes a good "work table". The new track is then scooted off to the side and the old track is removed and the path dug out a little more to accommodate the deeper 2x4 ties. About 120 feet of track was layed today through and on both sides of Tunnel #4.




Harry took on tree-trimming duty today.




Karl sets up the laser transit.

Karl and Kevin bend some rail in preparation for track laying.


The laser transit is a very handy tool for proper grading.


Bob is creating a nice area by the steps to the BBQ. He's installing a crossing gate here!