December 16, 2006
Work Day




BCWRR is the first railroad to install this Roll Models switch control and signal.


Basic leaf and needle cleanup.

Karl told us today that a picture from Will's Make-a-Wish trip to the BCWRR (web story) is the September picture in the Make-a-Wish Foundation's 2007 calendar. See the story page on this site.


The ballast should go out 2 inches from the edge of the tie, and then slope down.





(

| What's New | HO Layout | Schedule of Events | Home | Public Rides | Stories | Memorials | Links | About |